Monday, 23 September 2013

Parlour Fireplace

 
The fireplace wall has been painted.
 
 
The electricians have attached the heritage switches,
and reconnected the power.
 
 
The brickwork around the firebox has been
rendered and painted
and mantlepiece re-attached.
(Please excuse the mess!)
 
Progress is slowly being made.
 
 
 
 
 
 

Sunday, 1 September 2013

Parlor painted

The picture rails have been installed, and painted white.
 
 
Then the walls below the picture rail were painted "Peahen".
For those who want to be exact, it's 50% Dulux Peahen in a white base.