Construction of the small dividing wall to separate fridge from passage.
Construction of the small wall for an overhead kitchen cupboard to be attached.
An indication of the overnight temperature at present.
We left a 2L icecream container of water outside overnight.
This was lifted off the top in the morning.
This photo was taken at midday!!