Sunday, 25 March 2012

Machinery Shed

The machinery shed "floor" is a mix of hay, horse manure, ground sheets, and baling twine. In order to put a real floor in it requires digging it out. The decomposing matter will be great to start a garden bed, but all the plastic & twine needs to be pulled out. There is also rotting timbers from pallets and rocks and bricks mixed in. It is at least 12 inches (30cm) deep!



3 comments:

  1. Where's that bloody doug gone lol

    ReplyDelete
  2. Picture three... looks like you are digging to China! What a mammoth job.

    ReplyDelete
  3. What a load of shit! haha

    ReplyDelete