We have got to the end of Day 4 (or at least 3.5 days), and this is where we're up to.
When the old tin came off this section, it was found that the batterns were 1500mm apart, instead of the 900mm that is required. They also were rotten, and needed to be replaced. So they had to get extra timber and replace the old batterns, and put in extra ones as well. That slowed the job down a bit.